RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2902032548 - Archived data from Tue, 11. August 2020 18:05:45 CEST


This is all the information about APD 2902032548. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2902032548
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A09
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 388.4 V
Dark current: 7.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 102
Position in Box: 24
EP1 batch: 100
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.6317081 V     T = -25 °C: 352.7262667 V
Voltage for Gain 150: T = +20 °C: 396.5572658 V     T = -25 °C: 360.2950392 V
Voltage for Gain 200: T = +20 °C: 400.9391512 V     T = -25 °C: 364.545484 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.370348489 V-1     T = -25 °C: 4.915708326 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.301346632 V-1     T = -25 °C: 8.974517342 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.53849968 V-1     T = -25 °C: 15.71680474 V-1
Break-through voltage: T = +20 °C: 415.5445525 V     T = -25 °C: 379.5181973 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:18:58 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 11:15:33 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:01:30 CET jreher Updated box and position via API.
11. Aug 2020 18:05:45 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:36 CEST jreher Updated APD location via API.
20. Feb 2020 15:12:45 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:16 CET jreher Updated APD location via API.
28. Nov 2019 12:01:11 CET jreher Updated APD location via API.
25. Nov 2019 17:19:03 CET jreher Updated box and position via API.
20. Aug 2019 12:47:57 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:54 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:09 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:38 CEST Tobias Imported from Hamamatsu datasheet.