RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2902032542 - Archived data from Tue, 11. August 2020 18:05:44 CEST


This is all the information about APD 2902032542. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2902032542
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D06
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.8 V
Dark current: 7.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 102
Position in Box: 18
EP1 batch: 99
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.1296117 V     T = -25 °C: 344.8510994 V
Voltage for Gain 150: T = +20 °C: 388.0063503 V     T = -25 °C: 352.2210859 V
Voltage for Gain 200: T = +20 °C: 392.4087524 V     T = -25 °C: 356.3679734 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.560261159 V-1     T = -25 °C: 4.976794783 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.899641643 V-1     T = -25 °C: 9.239018294 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.45906324 V-1     T = -25 °C: 16.50202424 V-1
Break-through voltage: T = +20 °C: 407.5988094 V     T = -25 °C: 371.1995768 V
   
Notes:


Version history

Time Author Change comment
09. Feb 2021 11:21:01 CET jreher Assigned to capsule by script
05. Feb 2021 11:01:30 CET jreher Updated box and position via API.
18. Dec 2020 13:59:25 CET jreher Updated box and position via API.
11. Aug 2020 18:05:44 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:36 CEST jreher Updated APD location via API.
20. Feb 2020 15:12:44 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:16 CET jreher Updated APD location via API.
28. Nov 2019 12:01:10 CET jreher Updated APD location via API.
25. Nov 2019 17:19:03 CET jreher Updated box and position via API.
20. Aug 2019 12:47:31 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:53 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:09 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:37 CEST Tobias Imported from Hamamatsu datasheet.