RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2902032535 - Archived data from Fri, 05. February 2021 11:01:29 CET


This is all the information about APD 2902032535. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2902032535
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F08
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 379.5 V
Dark current: 7.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 102
Position in Box: 12
EP1 batch: 99
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.0105002 V     T = -25 °C: 343.9675365 V
Voltage for Gain 150: T = +20 °C: 386.8334829 V     T = -25 °C: 351.3113044 V
Voltage for Gain 200: T = +20 °C: 391.1945992 V     T = -25 °C: 355.4342328 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.609447354 V-1     T = -25 °C: 4.947330843 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.088066419 V-1     T = -25 °C: 9.219340361 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.14260452 V-1     T = -25 °C: 16.48855004 V-1
Break-through voltage: T = +20 °C: 406.4489861 V     T = -25 °C: 370.2419802 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 19:14:46 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 16:57:48 CEST jreher Updated box and position via API.
05. Feb 2021 11:01:29 CET jreher Updated box and position via API.
11. Aug 2020 18:05:43 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:35 CEST jreher Updated APD location via API.
20. Feb 2020 15:12:44 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:15 CET jreher Updated APD location via API.
28. Nov 2019 12:01:10 CET jreher Updated APD location via API.
25. Nov 2019 17:19:02 CET jreher Updated box and position via API.
20. Aug 2019 12:47:30 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:53 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:09 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:37 CEST Tobias Imported from Hamamatsu datasheet.