RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2901032497 - Archived data from Wed, 21. April 2021 11:02:45 CEST


This is all the information about APD 2901032497. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2901032497
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B07
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385.6 V
Dark current: 5.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 101
Position in Box: 46
EP1 batch: 99
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.1431273 V     T = -25 °C: 350.4374063 V
Voltage for Gain 150: T = +20 °C: 393.9875125 V     T = -25 °C: 357.9519303 V
Voltage for Gain 200: T = +20 °C: 398.3419815 V     T = -25 °C: 362.1283378 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.59098692 V-1     T = -25 °C: 4.619642883 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.057206748 V-1     T = -25 °C: 9.647354099 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.16024178 V-1     T = -25 °C: 15.11191633 V-1
Break-through voltage: T = +20 °C: 413.1444066 V     T = -25 °C: 377.0813908 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 16:11:53 CEST oafedulidis Assigned to capsule by script
21. Apr 2021 11:02:45 CEST jreher Updated box and position via API.
05. Feb 2021 11:01:25 CET jreher Updated box and position via API.
11. Aug 2020 18:05:40 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:34 CEST jreher Updated APD location via API.
20. Feb 2020 15:00:05 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:14 CET jreher Updated APD location via API.
28. Nov 2019 12:01:09 CET jreher Updated APD location via API.
25. Nov 2019 17:19:00 CET jreher Updated box and position via API.
20. Aug 2019 12:47:29 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:51 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:08 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:37 CEST Tobias Imported from Hamamatsu datasheet.