Show Hamamatsu Avalanche Photo Diode 2901032479 - Archived data from Tue, 11. August 2020 18:05:36 CEST


This is all the information about APD 2901032479. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2901032479
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D09
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.9 V
Dark current: 5.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 101
Position in Box: 29
EP1 batch: 98
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.5128133 V     T = -25 °C: 344.0937579 V
Voltage for Gain 150: T = +20 °C: 387.3569933 V     T = -25 °C: 351.4653099 V
Voltage for Gain 200: T = +20 °C: 391.7244278 V     T = -25 °C: 355.6037568 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.432552754 V-1     T = -25 °C: 4.808225991 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.562807528 V-1     T = -25 °C: 10.07022569 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.77202806 V-1     T = -25 °C: 15.89150057 V-1
Break-through voltage: T = +20 °C: 407.0236965 V     T = -25 °C: 370.6470793 V
   
Notes:


Version history

Time Author Change comment
27. Jun 2022 12:42:03 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 10:29:18 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:01:23 CET jreher Updated box and position via API.
11. Aug 2020 18:05:36 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:33 CEST jreher Updated APD location via API.
20. Feb 2020 15:00:04 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:13 CET jreher Updated APD location via API.
28. Nov 2019 12:01:07 CET jreher Updated APD location via API.
25. Nov 2019 17:18:59 CET jreher Updated box and position via API.
20. Aug 2019 12:47:06 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:50 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:08 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:36 CEST Tobias Imported from Hamamatsu datasheet.