RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2901032469 - Archived data from Thu, 15. April 2021 17:00:44 CEST


This is all the information about APD 2901032469. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2901032469
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C08
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.2 V
Dark current: 6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 101
Position in Box: 20
EP1 batch: 98
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.6158301 V     T = -25 °C: 346.8808444 V
Voltage for Gain 150: T = +20 °C: 390.4621935 V     T = -25 °C: 354.304028 V
Voltage for Gain 200: T = +20 °C: 394.8139563 V     T = -25 °C: 358.4676791 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.391354379 V-1     T = -25 °C: 5.473642419 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.55855904 V-1     T = -25 °C: 9.463104043 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.85438276 V-1     T = -25 °C: 16.17586295 V-1
Break-through voltage: T = +20 °C: 409.8522257 V     T = -25 °C: 373.4585424 V
   
Notes:


Version history

Time Author Change comment
25. Sep 2021 16:12:40 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:00:44 CEST jreher Updated box and position via API.
05. Feb 2021 11:01:22 CET jreher Updated box and position via API.
11. Aug 2020 18:05:34 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:32 CEST jreher Updated APD location via API.
20. Feb 2020 15:00:03 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:12 CET jreher Updated APD location via API.
28. Nov 2019 12:01:07 CET jreher Updated APD location via API.
25. Nov 2019 17:18:58 CET jreher Updated box and position via API.
20. Aug 2019 12:47:05 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:50 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:07 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:35 CEST Tobias Imported from Hamamatsu datasheet.