RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2820032404 - Archived data from Thu, 15. April 2021 17:00:43 CEST


This is all the information about APD 2820032404. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2820032404
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G10
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 383.4 V
Dark current: 11.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 100
Position in Box: 26
EP1 batch: 97
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.434941 V     T = -25 °C: 346.9388198 V
Voltage for Gain 150: T = +20 °C: 390.2521474 V     T = -25 °C: 354.3626318 V
Voltage for Gain 200: T = +20 °C: 394.5962026 V     T = -25 °C: 358.5224309 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.480321188 V-1     T = -25 °C: 4.90016977 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.763381787 V-1     T = -25 °C: 9.09284154 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.33999759 V-1     T = -25 °C: 16.13656822 V-1
Break-through voltage: T = +20 °C: 408.5505245 V     T = -25 °C: 373.2995286 V
   
Notes:


Version history

Time Author Change comment
25. Sep 2021 16:12:41 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:00:43 CEST jreher Updated box and position via API.
05. Feb 2021 11:01:16 CET jreher Updated box and position via API.
11. Aug 2020 18:05:29 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:29 CEST jreher Updated APD location via API.
20. Feb 2020 14:54:07 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:10 CET jreher Updated APD location via API.
28. Nov 2019 12:01:05 CET jreher Updated APD location via API.
25. Nov 2019 17:18:54 CET jreher Updated box and position via API.
20. Aug 2019 12:46:44 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:47 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:06 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:33 CEST Tobias Imported from Hamamatsu datasheet.