Subdetector specification:  
Serial: 2820032395
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B11
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 385 V
Dark current: 6.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 100
Position in Box: 19
EP1 batch: 97
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.6109409 V     T = -25 °C: 350.1074636 V
Voltage for Gain 150: T = +20 °C: 393.4814663 V     T = -25 °C: 357.5866528 V
Voltage for Gain 200: T = +20 °C: 397.8439274 V     T = -25 °C: 361.7462973 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.406734227 V-1     T = -25 °C: 4.812302938 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.629203322 V-1     T = -25 °C: 8.979430445 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.00277631 V-1     T = -25 °C: 15.69718313 V-1
Break-through voltage: T = +20 °C: 411.9078505 V     T = -25 °C: 376.0402106 V
   
Notes:


Version history

Time Author Change comment
14. Apr 2021 14:20:36 CEST jreher Assigned to capsule by script
16. Feb 2021 12:28:31 CET jreher Updated box and position via API.
05. Feb 2021 11:01:15 CET jreher Updated box and position via API.
11. Aug 2020 18:05:27 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:28 CEST jreher Updated APD location via API.
20. Feb 2020 14:50:09 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:09 CET jreher Updated APD location via API.
28. Nov 2019 12:01:04 CET jreher Updated APD location via API.
25. Nov 2019 17:18:53 CET jreher Updated box and position via API.
20. Aug 2019 12:46:44 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:47 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:06 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:33 CEST Tobias Imported from Hamamatsu datasheet.