RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2820032382 - Archived data from Tue, 16. February 2021 12:25:57 CET


This is all the information about APD 2820032382. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2820032382
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B09
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 383 V
Dark current: 7.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 100
Position in Box: 7
EP1 batch: 96
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.3557585 V     T = -25 °C: 347.6980747 V
Voltage for Gain 150: T = +20 °C: 391.2307157 V     T = -25 °C: 355.1479569 V
Voltage for Gain 200: T = +20 °C: 395.6054564 V     T = -25 °C: 359.3414957 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.445602672 V-1     T = -25 °C: 5.001604061 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.716493605 V-1     T = -25 °C: 9.243000642 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.15373343 V-1     T = -25 °C: 14.45297998 V-1
Break-through voltage: T = +20 °C: 410.2810761 V     T = -25 °C: 374.1204722 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:14:10 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:25:57 CET jreher Updated box and position via API.
05. Feb 2021 11:01:13 CET jreher Updated box and position via API.
11. Aug 2020 18:05:25 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:27 CEST jreher Updated APD location via API.
20. Feb 2020 14:50:08 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:08 CET jreher Updated APD location via API.
28. Nov 2019 12:01:03 CET jreher Updated APD location via API.
25. Nov 2019 17:18:52 CET jreher Updated box and position via API.
20. Aug 2019 12:46:08 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:46 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:06 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:33 CEST Tobias Imported from Hamamatsu datasheet.