RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2820032371 - Archived data from Tue, 11. August 2020 18:05:23 CEST


This is all the information about APD 2820032371. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2820032371
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D07
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 376.9 V
Dark current: 7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 99
Position in Box: 42
EP1 batch: 96
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.8411289 V     T = -25 °C: 341.7245763 V
Voltage for Gain 150: T = +20 °C: 384.6603573 V     T = -25 °C: 349.0216384 V
Voltage for Gain 200: T = +20 °C: 389.0195342 V     T = -25 °C: 353.1358805 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.691208115 V-1     T = -25 °C: 5.080455739 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.299885876 V-1     T = -25 °C: 9.574341512 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.46112371 V-1     T = -25 °C: 15.10396881 V-1
Break-through voltage: T = +20 °C: 404.9042842 V     T = -25 °C: 368.5168697 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:01:10 CET jreher Updated box and position via API.
11. Aug 2020 18:05:23 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:36 CEST jreher Updated APD location via API.
20. Feb 2020 14:50:08 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:51:02 CET jreher Updated APD location via API.
28. Nov 2019 12:01:24 CET jreher Updated APD location via API.
25. Nov 2019 17:18:51 CET jreher Updated box and position via API.
20. Aug 2019 12:46:07 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:45 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:05 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:32 CEST Tobias Imported from Hamamatsu datasheet.