Subdetector specification:  
Serial: 2820032370
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E07
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377.7 V
Dark current: 7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 99
Position in Box: 41
EP1 batch: 96
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.9250786 V     T = -25 °C: 342.7369965 V
Voltage for Gain 150: T = +20 °C: 385.8318968 V     T = -25 °C: 350.1935678 V
Voltage for Gain 200: T = +20 °C: 390.2875081 V     T = -25 °C: 354.2880216 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.685957479 V-1     T = -25 °C: 5.116718624 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.94208912 V-1     T = -25 °C: 9.136667556 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.07485886 V-1     T = -25 °C: 12.69822082 V-1
Break-through voltage: T = +20 °C: 406.4411548 V     T = -25 °C: 368.902507 V
   
Notes:


Version history

Time Author Change comment
19. May 2022 15:26:39 CEST oafedulidis Assigned to capsule by script
17. May 2021 09:16:20 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:01:10 CET jreher Updated box and position via API.
11. Aug 2020 18:05:23 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:36 CEST jreher Updated APD location via API.
20. Feb 2020 14:50:07 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:51:02 CET jreher Updated APD location via API.
28. Nov 2019 12:01:24 CET jreher Updated APD location via API.
25. Nov 2019 17:18:51 CET jreher Updated box and position via API.
20. Aug 2019 12:46:07 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:45 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:05 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:32 CEST Tobias Imported from Hamamatsu datasheet.