RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2819032324 - Archived data from Tue, 11. August 2020 18:05:18 CEST


This is all the information about APD 2819032324. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2819032324
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C13
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380 V
Dark current: 7.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 99
Position in Box: 18
EP1 batch: 95
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.7872256 V     T = -25 °C: 344.613002 V
Voltage for Gain 150: T = +20 °C: 387.6370941 V     T = -25 °C: 351.9821509 V
Voltage for Gain 200: T = +20 °C: 391.9986016 V     T = -25 °C: 356.119773 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.711526996 V-1     T = -25 °C: 4.736030094 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.311049052 V-1     T = -25 °C: 9.557556199 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.66288617 V-1     T = -25 °C: 15.18861576 V-1
Break-through voltage: T = +20 °C: 408.0034065 V     T = -25 °C: 371.7004386 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:58:00 CEST jreher Updated box and position via API.
14. Apr 2021 18:13:27 CEST oafedulidis Assigned to capsule by script
05. Feb 2021 11:01:07 CET jreher Updated box and position via API.
11. Aug 2020 18:05:18 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:34 CEST jreher Updated APD location via API.
17. Feb 2020 17:49:38 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:51:01 CET jreher Updated APD location via API.
28. Nov 2019 12:01:22 CET jreher Updated APD location via API.
25. Nov 2019 17:18:49 CET jreher Updated box and position via API.
20. Aug 2019 12:45:44 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:43 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:04 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:31 CEST Tobias Imported from Hamamatsu datasheet.