RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2909033060 - Archived data from Tue, 11. August 2020 18:05:58 CEST


This is all the information about APD 2909033060. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2909033060
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H07
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 384.9 V
Dark current: 9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 107
Position in Box: 38
EP1 batch: 109
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.1973115 V     T = -25 °C: 348.7106985 V
Voltage for Gain 150: T = +20 °C: 392.053805 V     T = -25 °C: 356.1795846 V
Voltage for Gain 200: T = +20 °C: 396.4211833 V     T = -25 °C: 360.3733439 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.502320513 V-1     T = -25 °C: 4.93962959 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.79758809 V-1     T = -25 °C: 9.053654147 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.31395577 V-1     T = -25 °C: 15.95186243 V-1
Break-through voltage: T = +20 °C: 410.6771815 V     T = -25 °C: 375.5570504 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:57:53 CEST jreher Updated box and position via API.
14. Apr 2021 18:39:18 CEST oafedulidis Assigned to capsule by script
05. Feb 2021 11:02:11 CET jreher Updated box and position via API.
11. Aug 2020 18:05:58 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:01 CEST jreher Updated APD location via API.
20. Feb 2020 15:18:53 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:37 CET jreher Updated APD location via API.
27. Nov 2019 19:47:42 CET jreher Updated APD location via API.
25. Nov 2019 17:19:28 CET jreher Updated box and position via API.
23. Aug 2019 11:59:25 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:55 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:03 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:30 CEST Tobias Imported from Hamamatsu datasheet.