RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2909033059 - Archived data from Tue, 11. August 2020 18:05:58 CEST


This is all the information about APD 2909033059. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2909033059
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B08
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 384.4 V
Dark current: 6.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 107
Position in Box: 37
EP1 batch: 109
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.5382954 V     T = -25 °C: 348.9692606 V
Voltage for Gain 150: T = +20 °C: 392.3716641 V     T = -25 °C: 356.426972 V
Voltage for Gain 200: T = +20 °C: 396.7110107 V     T = -25 °C: 360.5966712 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.438798114 V-1     T = -25 °C: 4.894432486 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.687908787 V-1     T = -25 °C: 8.990000635 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.19287594 V-1     T = -25 °C: 15.9144679 V-1
Break-through voltage: T = +20 °C: 411.7408689 V     T = -25 °C: 375.5533498 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:19:35 CEST oafedulidis Assigned to capsule by script
03. May 2021 15:19:40 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:02:11 CET jreher Updated box and position via API.
11. Aug 2020 18:05:58 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:01 CEST jreher Updated APD location via API.
20. Feb 2020 15:18:53 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:36 CET jreher Updated APD location via API.
27. Nov 2019 19:47:42 CET jreher Updated APD location via API.
25. Nov 2019 17:19:28 CET jreher Updated box and position via API.
23. Aug 2019 11:59:25 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:55 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:03 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:30 CEST Tobias Imported from Hamamatsu datasheet.