RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2909033040 - Archived data from Fri, 05. February 2021 11:02:09 CET


This is all the information about APD 2909033040. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2909033040
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G12
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 379.7 V
Dark current: 11.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 107
Position in Box: 21
EP1 batch: 108
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.7783739 V     T = -25 °C: 343.6407578 V
Voltage for Gain 150: T = +20 °C: 386.5826306 V     T = -25 °C: 350.9697921 V
Voltage for Gain 200: T = +20 °C: 390.9124658 V     T = -25 °C: 355.092368 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.692556509 V-1     T = -25 °C: 5.068884868 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.373172046 V-1     T = -25 °C: 9.479200097 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.62266648 V-1     T = -25 °C: 14.99517849 V-1
Break-through voltage: T = +20 °C: 405.4155775 V     T = -25 °C: 369.8518084 V
   
Notes:


Version history

Time Author Change comment
20. Oct 2021 09:32:18 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:00:52 CEST jreher Updated box and position via API.
05. Feb 2021 11:02:09 CET jreher Updated box and position via API.
11. Aug 2020 18:05:54 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:59 CEST jreher Updated APD location via API.
20. Feb 2020 15:18:51 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:35 CET jreher Updated APD location via API.
27. Nov 2019 19:47:41 CET jreher Updated APD location via API.
25. Nov 2019 17:19:27 CET jreher Updated box and position via API.
23. Aug 2019 11:59:07 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:54 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:03 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:29 CEST Tobias Imported from Hamamatsu datasheet.