RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2908033024 - Archived data from Wed, 14. April 2021 18:39:13 CEST


This is all the information about APD 2908033024. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2908033024
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2908033024/2811031643
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: B07
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 384.2 V
Dark current: 9.4 nA
   
Screening Logistics:  
Available: No
Storage Box: 107
Position in Box: 9
EP1 batch: 108
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.3214268 V     T = -25 °C: 348.7391134 V
Voltage for Gain 150: T = +20 °C: 392.2057805 V     T = -25 °C: 356.1810023 V
Voltage for Gain 200: T = +20 °C: 396.5869101 V     T = -25 °C: 360.3670849 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.491044688 V-1     T = -25 °C: 4.978114418 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.767814411 V-1     T = -25 °C: 9.268691485 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.3793619 V-1     T = -25 °C: 14.54529415 V-1
Break-through voltage: T = +20 °C: 411.4754331 V     T = -25 °C: 375.1905087 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:57:52 CEST jreher Updated box and position via API.
14. Apr 2021 18:39:13 CEST oafedulidis Assigned to capsule by script
05. Feb 2021 11:02:07 CET jreher Updated box and position via API.
11. Aug 2020 18:05:52 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:58 CEST jreher Updated APD location via API.
20. Feb 2020 15:18:51 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:34 CET jreher Updated APD location via API.
27. Nov 2019 19:47:40 CET jreher Updated APD location via API.
25. Nov 2019 17:19:26 CET jreher Updated box and position via API.
23. Aug 2019 11:59:06 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:53 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:02 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:29 CEST Tobias Imported from Hamamatsu datasheet.