RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2908033022 - Archived data from Tue, 11. August 2020 18:05:52 CEST


This is all the information about APD 2908033022. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2908033022
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A06
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385.6 V
Dark current: 7.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 107
Position in Box: 7
EP1 batch: 108
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.8749859 V     T = -25 °C: 350.2169628 V
Voltage for Gain 150: T = +20 °C: 393.7581518 V     T = -25 °C: 357.7302825 V
Voltage for Gain 200: T = +20 °C: 398.1040963 V     T = -25 °C: 361.9141681 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.62542206 V-1     T = -25 °C: 4.831845743 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.266253506 V-1     T = -25 °C: 9.608731317 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.47138604 V-1     T = -25 °C: 15.2689701 V-1
Break-through voltage: T = +20 °C: 412.8091573 V     T = -25 °C: 377.2900141 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:02:07 CET jreher Updated box and position via API.
11. Aug 2020 18:05:52 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:58 CEST jreher Updated APD location via API.
20. Feb 2020 15:16:07 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:34 CET jreher Updated APD location via API.
27. Nov 2019 19:47:39 CET jreher Updated APD location via API.
25. Nov 2019 17:19:26 CET jreher Updated box and position via API.
23. Aug 2019 11:59:06 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:53 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:02 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:29 CEST Tobias Imported from Hamamatsu datasheet.