RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2908033007 - Archived data from Tue, 11. August 2020 18:00:11 CEST


This is all the information about APD 2908033007. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2908033007
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D02
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.7 V
Dark current: 7.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 106
Position in Box: 42
EP1 batch: 108
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.8807161 V     T = -25 °C: 346.0238999 V
Voltage for Gain 150: T = +20 °C: 389.8282293 V     T = -25 °C: 353.4663826 V
Voltage for Gain 200: T = +20 °C: 394.1869024 V     T = -25 °C: 357.6222626 V
Gain/Voltage slope at M = 100: T = +20 °C: 3.604278744 V-1     T = -25 °C: 4.845318016 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.067078053 V-1     T = -25 °C: 8.897001406 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.06383163 V-1     T = -25 °C: 15.72271624 V-1
Break-through voltage: T = +20 °C: 409.4874856 V     T = -25 °C: 373.1749095 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:02:03 CET jreher Updated box and position via API.
11. Aug 2020 18:00:11 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:56 CEST jreher Updated APD location via API.
28. Jan 2020 15:39:21 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:33 CET jreher Updated APD location via API.
27. Nov 2019 19:47:31 CET jreher Updated APD location via API.
25. Nov 2019 17:19:23 CET jreher Updated box and position via API.
23. Aug 2019 11:59:05 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:48 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:02 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:28 CEST Tobias Imported from Hamamatsu datasheet.