RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2907032934 - Archived data from Fri, 05. February 2021 11:01:56 CET


This is all the information about APD 2907032934. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2907032934
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B12
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.9 V
Dark current: 5.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 113
Position in Box: 50
EP1 batch: 106
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.7988572 V     T = -25 °C: 346.3236081 V
Voltage for Gain 150: T = +20 °C: 389.612369 V     T = -25 °C: 353.7224274 V
Voltage for Gain 200: T = +20 °C: 393.9361894 V     T = -25 °C: 357.861422 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.678738853 V-1     T = -25 °C: 4.798990735 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.385076581 V-1     T = -25 °C: 9.742262437 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.69170949 V-1     T = -25 °C: 15.53600879 V-1
Break-through voltage: T = +20 °C: 409.3575835 V     T = -25 °C: 373.3899107 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:26:26 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:01:56 CET jreher Updated box and position via API.
11. Aug 2020 18:00:02 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:53 CEST jreher Updated APD location via API.
28. Jan 2020 15:35:13 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:30 CET jreher Updated APD location via API.
27. Nov 2019 19:47:21 CET jreher Updated APD location via API.
25. Nov 2019 17:19:19 CET jreher Updated box and position via API.
23. Aug 2019 11:58:19 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:40 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:01 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:27 CEST Tobias Imported from Hamamatsu datasheet.