RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2907032919 - Archived data from Thu, 15. April 2021 17:01:06 CEST


This is all the information about APD 2907032919. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2907032919
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E12
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.7 V
Dark current: 11.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 105
Position in Box: 38
EP1 batch: 106
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.4027668 V     T = -25 °C: 344.3300548 V
Voltage for Gain 150: T = +20 °C: 387.2290177 V     T = -25 °C: 351.6886857 V
Voltage for Gain 200: T = +20 °C: 391.5878056 V     T = -25 °C: 355.8037367 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.492216625 V-1     T = -25 °C: 4.842421694 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.781763335 V-1     T = -25 °C: 9.836412304 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.35108631 V-1     T = -25 °C: 15.77659076 V-1
Break-through voltage: T = +20 °C: 407.5233656 V     T = -25 °C: 371.3528782 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 19:46:13 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:06 CEST jreher Updated box and position via API.
05. Feb 2021 11:01:55 CET jreher Updated box and position via API.
11. Aug 2020 17:59:59 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:52 CEST jreher Updated APD location via API.
28. Jan 2020 15:23:53 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:29 CET jreher Updated APD location via API.
27. Nov 2019 19:47:20 CET jreher Updated APD location via API.
25. Nov 2019 17:19:19 CET jreher Updated box and position via API.
23. Aug 2019 11:58:18 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:39 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:00 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:26 CEST Tobias Imported from Hamamatsu datasheet.