RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2907032908 - Archived data from Tue, 11. August 2020 17:59:57 CEST


This is all the information about APD 2907032908. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2907032908
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E10
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379 V
Dark current: 10.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 113
Position in Box: 44
EP1 batch: 106
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.6802544 V     T = -25 °C: 343.4250123 V
Voltage for Gain 150: T = +20 °C: 386.5075353 V     T = -25 °C: 350.7549989 V
Voltage for Gain 200: T = +20 °C: 390.8524368 V     T = -25 °C: 354.8688675 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.725973728 V-1     T = -25 °C: 4.780030766 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.391870306 V-1     T = -25 °C: 9.730042922 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.70353867 V-1     T = -25 °C: 15.53450692 V-1
Break-through voltage: T = +20 °C: 406.7116466 V     T = -25 °C: 370.3326916 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:26:26 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:01:54 CET jreher Updated box and position via API.
11. Aug 2020 17:59:57 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:51 CEST jreher Updated APD location via API.
28. Jan 2020 15:23:52 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:28 CET jreher Updated APD location via API.
27. Nov 2019 19:47:19 CET jreher Updated APD location via API.
25. Nov 2019 17:19:18 CET jreher Updated box and position via API.
23. Aug 2019 11:58:18 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:39 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:00 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:26 CEST Tobias Imported from Hamamatsu datasheet.