RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2906032884 - Archived data from Fri, 05. February 2021 11:01:52 CET


This is all the information about APD 2906032884. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2906032884
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F11
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 384 V
Dark current: 15.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 113
Position in Box: 36
EP1 batch: 105
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.0989621 V     T = -25 °C: 348.133567 V
Voltage for Gain 150: T = +20 °C: 390.9517395 V     T = -25 °C: 355.7150752 V
Voltage for Gain 200: T = +20 °C: 395.3101437 V     T = -25 °C: 359.9541142 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.583321036 V-1     T = -25 °C: 4.799504933 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.048292517 V-1     T = -25 °C: 9.755125055 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.1729713 V-1     T = -25 °C: 14.83571688 V-1
Break-through voltage: T = +20 °C: 411.057696 V     T = -25 °C: 373.8055819 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:26:24 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:01:52 CET jreher Updated box and position via API.
11. Aug 2020 17:59:54 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:49 CEST jreher Updated APD location via API.
28. Jan 2020 15:23:51 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:27 CET jreher Updated APD location via API.
27. Nov 2019 19:47:18 CET jreher Updated APD location via API.
25. Nov 2019 17:19:17 CET jreher Updated box and position via API.
23. Aug 2019 11:58:00 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:37 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:00 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:25 CEST Tobias Imported from Hamamatsu datasheet.