RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2906032881 - Archived data from Tue, 11. August 2020 17:59:54 CEST


This is all the information about APD 2906032881. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2906032881
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C13
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 387 V
Dark current: 11.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 113
Position in Box: 35
EP1 batch: 105
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.2331123 V     T = -25 °C: 351.3161099 V
Voltage for Gain 150: T = +20 °C: 395.0666624 V     T = -25 °C: 358.7879009 V
Voltage for Gain 200: T = +20 °C: 399.417347 V     T = -25 °C: 362.9552038 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.520431408 V-1     T = -25 °C: 4.719491251 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.953750051 V-1     T = -25 °C: 9.63342264 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.93402152 V-1     T = -25 °C: 15.29802548 V-1
Break-through voltage: T = +20 °C: 413.4287916 V     T = -25 °C: 377.1959216 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:26:24 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:01:52 CET jreher Updated box and position via API.
11. Aug 2020 17:59:54 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:49 CEST jreher Updated APD location via API.
28. Jan 2020 15:23:51 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:27 CET jreher Updated APD location via API.
27. Nov 2019 19:47:18 CET jreher Updated APD location via API.
25. Nov 2019 17:19:16 CET jreher Updated box and position via API.
23. Aug 2019 11:57:59 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:37 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:00 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:25 CEST Tobias Imported from Hamamatsu datasheet.