RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2906032866 - Archived data from Tue, 11. August 2020 17:59:51 CEST


This is all the information about APD 2906032866. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2906032866
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B08
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 382 V
Dark current: 9.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 104
Position in Box: 49
EP1 batch: 105
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.5734368 V     T = -25 °C: 347.1198298 V
Voltage for Gain 150: T = +20 °C: 390.4155486 V     T = -25 °C: 354.5193194 V
Voltage for Gain 200: T = +20 °C: 394.7654791 V     T = -25 °C: 358.6555999 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.413659407 V-1     T = -25 °C: 4.840367266 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.618668238 V-1     T = -25 °C: 8.955636847 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.91473296 V-1     T = -25 °C: 15.91681019 V-1
Break-through voltage: T = +20 °C: 409.5530813 V     T = -25 °C: 373.3482178 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 19:04:16 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:27:27 CET jreher Updated box and position via API.
05. Feb 2021 11:01:49 CET jreher Updated box and position via API.
11. Aug 2020 17:59:51 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:48 CEST jreher Updated APD location via API.
28. Jan 2020 15:22:00 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:26 CET jreher Updated APD location via API.
27. Nov 2019 19:47:10 CET jreher Updated APD location via API.
25. Nov 2019 17:19:15 CET jreher Updated box and position via API.
23. Aug 2019 11:57:58 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:32 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:59 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:24 CEST Tobias Imported from Hamamatsu datasheet.