RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2906032860 - Archived data from Tue, 11. August 2020 17:59:50 CEST


This is all the information about APD 2906032860. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2906032860
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B07
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.3 V
Dark current: 9.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 104
Position in Box: 43
EP1 batch: 104
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.6254823 V     T = -25 °C: 346.2301051 V
Voltage for Gain 150: T = +20 °C: 389.4827924 V     T = -25 °C: 353.6564667 V
Voltage for Gain 200: T = +20 °C: 393.8265135 V     T = -25 °C: 357.8093339 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.409390224 V-1     T = -25 °C: 4.80766951 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.54520047 V-1     T = -25 °C: 9.771403801 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.85803194 V-1     T = -25 °C: 15.52758394 V-1
Break-through voltage: T = +20 °C: 408.7379806 V     T = -25 °C: 372.709421 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:01:48 CET jreher Updated box and position via API.
11. Aug 2020 17:59:50 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:48 CEST jreher Updated APD location via API.
28. Jan 2020 15:22:00 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:25 CET jreher Updated APD location via API.
27. Nov 2019 19:47:09 CET jreher Updated APD location via API.
25. Nov 2019 17:19:14 CET jreher Updated box and position via API.
23. Aug 2019 11:57:34 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:32 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:59 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:24 CEST Tobias Imported from Hamamatsu datasheet.