RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2906032841 - Archived data from Tue, 11. August 2020 17:59:47 CEST


This is all the information about APD 2906032841. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2906032841
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B11
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385.9 V
Dark current: 8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 104
Position in Box: 28
EP1 batch: 104
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.695639 V     T = -25 °C: 350.7736772 V
Voltage for Gain 150: T = +20 °C: 394.5004063 V     T = -25 °C: 358.2735735 V
Voltage for Gain 200: T = +20 °C: 398.8140505 V     T = -25 °C: 362.4830032 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.372566882 V-1     T = -25 °C: 4.954087822 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.643770195 V-1     T = -25 °C: 9.149728296 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.14977898 V-1     T = -25 °C: 14.30494323 V-1
Break-through voltage: T = +20 °C: 412.6217272 V     T = -25 °C: 376.7321098 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 10:39:50 CET oafedulidis Assigned to capsule by script
21. Apr 2021 11:02:30 CEST jreher Updated box and position via API.
05. Feb 2021 11:01:46 CET jreher Updated box and position via API.
11. Aug 2020 17:59:47 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:46 CEST jreher Updated APD location via API.
28. Jan 2020 14:57:05 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:24 CET jreher Updated APD location via API.
27. Nov 2019 19:47:08 CET jreher Updated APD location via API.
25. Nov 2019 17:19:13 CET jreher Updated box and position via API.
23. Aug 2019 11:57:32 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:31 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:59 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:24 CEST Tobias Imported from Hamamatsu datasheet.