RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2906032838 - Archived data from Tue, 11. August 2020 17:59:46 CEST


This is all the information about APD 2906032838. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2906032838
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D03
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.6 V
Dark current: 8.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 104
Position in Box: 26
EP1 batch: 104
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.7689247 V     T = -25 °C: 344.3515847 V
Voltage for Gain 150: T = +20 °C: 387.5258577 V     T = -25 °C: 351.7561291 V
Voltage for Gain 200: T = +20 °C: 391.8319939 V     T = -25 °C: 355.8863331 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.731382219 V-1     T = -25 °C: 4.755959782 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.594094115 V-1     T = -25 °C: 9.801454624 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.93665026 V-1     T = -25 °C: 15.56502049 V-1
Break-through voltage: T = +20 °C: 407.5935425 V     T = -25 °C: 371.42429 V
   
Notes:


Version history

Time Author Change comment
15. Feb 2021 15:38:18 CET jreher Assigned to capsule by script
05. Feb 2021 11:01:46 CET jreher Updated box and position via API.
18. Dec 2020 13:59:53 CET jreher Updated box and position via API.
11. Aug 2020 17:59:46 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:46 CEST jreher Updated APD location via API.
28. Jan 2020 14:57:05 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:24 CET jreher Updated APD location via API.
27. Nov 2019 19:47:08 CET jreher Updated APD location via API.
25. Nov 2019 17:19:13 CET jreher Updated box and position via API.
23. Aug 2019 11:57:32 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:30 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:59 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:24 CEST Tobias Imported from Hamamatsu datasheet.