RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2905032812 - Archived data from Tue, 11. August 2020 17:59:42 CEST


This is all the information about APD 2905032812. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2905032812
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F06
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.8 V
Dark current: 5.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 104
Position in Box: 3
EP1 batch: 102
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.1794668 V     T = -25 °C: 344.6511582 V
Voltage for Gain 150: T = +20 °C: 387.9456982 V     T = -25 °C: 351.9883708 V
Voltage for Gain 200: T = +20 °C: 392.2529398 V     T = -25 °C: 356.0986801 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.57154315 V-1     T = -25 °C: 4.713609567 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.135854454 V-1     T = -25 °C: 9.570202897 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.37392813 V-1     T = -25 °C: 15.2749134 V-1
Break-through voltage: T = +20 °C: 408.9428983 V     T = -25 °C: 371.3700591 V
   
Notes:


Version history

Time Author Change comment
29. Apr 2021 17:05:26 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:28:33 CET jreher Updated box and position via API.
05. Feb 2021 11:01:43 CET jreher Updated box and position via API.
11. Aug 2020 17:59:42 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:44 CEST jreher Updated APD location via API.
28. Jan 2020 14:57:03 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:23 CET jreher Updated APD location via API.
27. Nov 2019 19:47:06 CET jreher Updated APD location via API.
25. Nov 2019 17:19:11 CET jreher Updated box and position via API.
20. Aug 2019 12:48:55 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:28 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:58 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:23 CEST Tobias Imported from Hamamatsu datasheet.