RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2818032262 - Archived data from Tue, 11. August 2020 18:05:13 CEST


This is all the information about APD 2818032262. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2818032262
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B13
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 388.4 V
Dark current: 7.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 98
Position in Box: 40
EP1 batch: 94
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.6550966 V     T = -25 °C: 352.5828308 V
Voltage for Gain 150: T = +20 °C: 396.5331715 V     T = -25 °C: 360.1246438 V
Voltage for Gain 200: T = +20 °C: 400.8836163 V     T = -25 °C: 364.3662928 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.365690789 V-1     T = -25 °C: 4.614662982 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.512373173 V-1     T = -25 °C: 9.144193027 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.78617767 V-1     T = -25 °C: 14.287198 V-1
Break-through voltage: T = +20 °C: 415.881143 V     T = -25 °C: 379.7184281 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:01:02 CET jreher Updated box and position via API.
11. Aug 2020 18:05:13 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:32 CEST jreher Updated APD location via API.
17. Feb 2020 17:49:59 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:59 CET jreher Updated APD location via API.
27. Nov 2019 19:46:19 CET jreher Updated APD location via API.
25. Nov 2019 17:18:46 CET jreher Updated box and position via API.
20. Aug 2019 12:44:49 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:42 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:56 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:20 CEST Tobias Imported from Hamamatsu datasheet.