RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2818032259 - Archived data from Mon, 03. May 2021 15:19:53 CEST


This is all the information about APD 2818032259. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2818032259
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D12
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 380.2 V
Dark current: 12.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 98
Position in Box: 38
EP1 batch: 94
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.5927828 V     T = -25 °C: 345.8639999 V
Voltage for Gain 150: T = +20 °C: 388.365297 V     T = -25 °C: 353.2224312 V
Voltage for Gain 200: T = +20 °C: 392.6792998 V     T = -25 °C: 357.2296659 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.436466842 V-1     T = -25 °C: 4.97161169 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.718922217 V-1     T = -25 °C: 9.672586232 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.10984756 V-1     T = -25 °C: 14.95864552 V-1
Break-through voltage: T = +20 °C: 408.8052365 V     T = -25 °C: 372.1597812 V
   
Notes:


Version history

Time Author Change comment
29. Mar 2022 12:37:28 CEST oafedulidis Assigned to capsule by script
03. May 2021 15:19:53 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:01:01 CET jreher Updated box and position via API.
11. Aug 2020 18:05:13 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:31 CEST jreher Updated APD location via API.
17. Feb 2020 17:49:59 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:58 CET jreher Updated APD location via API.
27. Nov 2019 19:46:19 CET jreher Updated APD location via API.
25. Nov 2019 17:18:46 CET jreher Updated box and position via API.
20. Aug 2019 12:44:49 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:42 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:56 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:20 CEST Tobias Imported from Hamamatsu datasheet.