RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2818032237 - Archived data from Tue, 11. August 2020 18:05:10 CEST


This is all the information about APD 2818032237. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2818032237
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E09
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 377.1 V
Dark current: 10.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 98
Position in Box: 24
EP1 batch: 94
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.5993239 V     T = -25 °C: 341.6537268 V
Voltage for Gain 150: T = +20 °C: 384.3627107 V     T = -25 °C: 348.9217115 V
Voltage for Gain 200: T = +20 °C: 388.6833186 V     T = -25 °C: 352.9959792 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.442138414 V-1     T = -25 °C: 5.102985242 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.637038095 V-1     T = -25 °C: 9.598414953 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.89825288 V-1     T = -25 °C: 15.20166324 V-1
Break-through voltage: T = +20 °C: 403.881306 V     T = -25 °C: 367.7675312 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 15:17:26 CEST oafedulidis Assigned to capsule by script
10. May 2021 14:01:56 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:01:00 CET jreher Updated box and position via API.
11. Aug 2020 18:05:10 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:30 CEST jreher Updated APD location via API.
17. Feb 2020 17:50:28 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:57 CET jreher Updated APD location via API.
27. Nov 2019 19:46:18 CET jreher Updated APD location via API.
25. Nov 2019 17:18:45 CET jreher Updated box and position via API.
20. Aug 2019 12:44:48 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:40 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:55 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:20 CEST Tobias Imported from Hamamatsu datasheet.