RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2818032227 - Archived data from Tue, 11. August 2020 18:05:08 CEST


This is all the information about APD 2818032227. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2818032227
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E05
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 376.8 V
Dark current: 10.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 98
Position in Box: 15
EP1 batch: 93
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.8977944 V     T = -25 °C: 341.7790548 V
Voltage for Gain 150: T = +20 °C: 384.6204791 V     T = -25 °C: 349.0084626 V
Voltage for Gain 200: T = +20 °C: 388.9148766 V     T = -25 °C: 353.0649565 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.744955483 V-1     T = -25 °C: 5.106042683 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.432197101 V-1     T = -25 °C: 9.636317595 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.79952878 V-1     T = -25 °C: 15.38256162 V-1
Break-through voltage: T = +20 °C: 404.7266078 V     T = -25 °C: 368.3859595 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:00:59 CET jreher Updated box and position via API.
11. Aug 2020 18:05:08 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:29 CEST jreher Updated APD location via API.
17. Feb 2020 17:50:27 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:56 CET jreher Updated APD location via API.
27. Nov 2019 19:46:17 CET jreher Updated APD location via API.
25. Nov 2019 17:18:44 CET jreher Updated box and position via API.
20. Aug 2019 12:44:25 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:40 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:55 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:19 CEST Tobias Imported from Hamamatsu datasheet.