RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2817032161 - Archived data from Tue, 11. August 2020 18:05:00 CEST


This is all the information about APD 2817032161. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2817032161
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C13
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.9 V
Dark current: 19.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 97
Position in Box: 27
EP1 batch: 92
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.7316279 V     T = -25 °C: 345.8812251 V
Voltage for Gain 150: T = +20 °C: 388.5613067 V     T = -25 °C: 353.2137422 V
Voltage for Gain 200: T = +20 °C: 392.8872138 V     T = -25 °C: 357.4761166 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.664586114 V-1     T = -25 °C: 5.321393521 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.389856381 V-1     T = -25 °C: 8.426359387 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.71059412 V-1     T = -25 °C: 15.84030828 V-1
Break-through voltage: T = +20 °C: 408.1319275 V     T = -25 °C: 372.2142763 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:00:52 CET jreher Updated box and position via API.
11. Aug 2020 18:05:00 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:25 CEST jreher Updated APD location via API.
17. Feb 2020 17:50:53 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:54 CET jreher Updated APD location via API.
27. Nov 2019 19:46:07 CET jreher Updated APD location via API.
25. Nov 2019 17:18:40 CET jreher Updated box and position via API.
23. Aug 2019 10:15:30 CEST spankonin Updated APD batch assignment via API.
20. Aug 2019 12:44:06 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:10 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:54 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:18 CEST Tobias Imported from Hamamatsu datasheet.