RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2816032101 - Archived data from Tue, 11. August 2020 18:04:56 CEST


This is all the information about APD 2816032101. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2816032101
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D13
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 386.2 V
Dark current: 10.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 97
Position in Box: 1
EP1 batch: 91
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.909839 V     T = -25 °C: 350.9134448 V
Voltage for Gain 150: T = +20 °C: 394.6658609 V     T = -25 °C: 358.3183007 V
Voltage for Gain 200: T = +20 °C: 398.9463702 V     T = -25 °C: 362.4566575 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.679576957 V-1     T = -25 °C: 4.922765793 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.415529593 V-1     T = -25 °C: 9.159553659 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.91075335 V-1     T = -25 °C: 16.38425485 V-1
Break-through voltage: T = +20 °C: 413.7624642 V     T = -25 °C: 377.3077898 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:31:17 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 11:14:29 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:00:49 CET jreher Updated box and position via API.
11. Aug 2020 18:04:56 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:23 CEST jreher Updated APD location via API.
17. Feb 2020 17:52:56 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:52 CET jreher Updated APD location via API.
27. Nov 2019 19:46:05 CET jreher Updated APD location via API.
25. Nov 2019 17:18:38 CET jreher Updated box and position via API.
20. Aug 2019 12:40:48 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:08 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:53 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:17 CEST Tobias Imported from Hamamatsu datasheet.