RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2815031967 - Archived data from Wed, 03. February 2021 18:25:59 CET


This is all the information about APD 2815031967. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2815031967
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E06
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.7 V
Dark current: 6.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 94
Position in Box: 45
EP1 batch: 88
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.9947962 V     T = -25 °C: 345.7047387 V
Voltage for Gain 150: T = +20 °C: 388.7577892 V     T = -25 °C: 352.8971324 V
Voltage for Gain 200: T = +20 °C: 393.0630428 V     T = -25 °C: 356.9272071 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.611280379 V-1     T = -25 °C: 5.104926122 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.158891149 V-1     T = -25 °C: 9.804260168 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.44584142 V-1     T = -25 °C: 15.61686899 V-1
Break-through voltage: T = +20 °C: 408.5652842 V     T = -25 °C: 372.0286551 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:00:30 CET jreher Updated box and position via API.
03. Feb 2021 18:25:59 CET jreher Updated box and position via API.
11. Aug 2020 17:59:21 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:18 CEST jreher Updated APD location via API.
28. Jan 2020 14:39:34 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:44 CET jreher Updated APD location via API.
27. Nov 2019 19:45:35 CET jreher Updated APD location via API.
25. Nov 2019 17:18:27 CET jreher Updated box and position via API.
20. Aug 2019 12:35:50 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:47 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:50 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:12 CEST Tobias Imported from Hamamatsu datasheet.