RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2815031946 - Archived data from Wed, 03. February 2021 18:25:57 CET


This is all the information about APD 2815031946. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2815031946
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E09
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377.4 V
Dark current: 6.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 94
Position in Box: 27
EP1 batch: 87
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.6612973 V     T = -25 °C: 342.2871714 V
Voltage for Gain 150: T = +20 °C: 385.4102402 V     T = -25 °C: 349.574551 V
Voltage for Gain 200: T = +20 °C: 389.7244153 V     T = -25 °C: 353.649004 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.450854281 V-1     T = -25 °C: 4.894212847 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.712220655 V-1     T = -25 °C: 9.126943748 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.28507667 V-1     T = -25 °C: 16.37705036 V-1
Break-through voltage: T = +20 °C: 405.3757952 V     T = -25 °C: 368.9444191 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:00:28 CET jreher Updated box and position via API.
03. Feb 2021 18:25:57 CET jreher Updated box and position via API.
11. Aug 2020 17:59:17 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:16 CEST jreher Updated APD location via API.
28. Jan 2020 14:39:33 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:42 CET jreher Updated APD location via API.
27. Nov 2019 19:45:34 CET jreher Updated APD location via API.
25. Nov 2019 17:18:26 CET jreher Updated box and position via API.
20. Aug 2019 12:35:29 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:46 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:49 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:12 CEST Tobias Imported from Hamamatsu datasheet.