RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2815031945 - Archived data from Wed, 03. February 2021 18:25:57 CET


This is all the information about APD 2815031945. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2815031945
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D09
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.2 V
Dark current: 6.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 94
Position in Box: 26
EP1 batch: 87
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.8940519 V     T = -25 °C: 343.5930708 V
Voltage for Gain 150: T = +20 °C: 386.6617737 V     T = -25 °C: 350.8298609 V
Voltage for Gain 200: T = +20 °C: 390.975198 V     T = -25 °C: 354.8798892 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.700887736 V-1     T = -25 °C: 4.790486978 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.390407863 V-1     T = -25 °C: 9.852891138 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.74341619 V-1     T = -25 °C: 15.89466366 V-1
Break-through voltage: T = +20 °C: 406.7971846 V     T = -25 °C: 369.5894215 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:00:28 CET jreher Updated box and position via API.
03. Feb 2021 18:25:57 CET jreher Updated box and position via API.
11. Aug 2020 17:59:17 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:16 CEST jreher Updated APD location via API.
28. Jan 2020 14:39:32 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:42 CET jreher Updated APD location via API.
27. Nov 2019 19:45:34 CET jreher Updated APD location via API.
25. Nov 2019 17:18:26 CET jreher Updated box and position via API.
20. Aug 2019 12:35:29 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:45 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:49 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:11 CEST Tobias Imported from Hamamatsu datasheet.