RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2814031878 - Archived data from Wed, 14. April 2021 18:39:17 CEST


This is all the information about APD 2814031878. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2814031878
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2814031878/2003021654
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: B07
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.9 V
Dark current: 10.1 nA
   
Screening Logistics:  
Available: No
Storage Box: 93
Position in Box: 49
EP1 batch: 86
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.291422 V     T = -25 °C: 348.7905688 V
Voltage for Gain 150: T = +20 °C: 392.1612946 V     T = -25 °C: 356.2130628 V
Voltage for Gain 200: T = +20 °C: 396.5424335 V     T = -25 °C: 360.3853414 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.505541256 V-1     T = -25 °C: 4.965195156 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.787209403 V-1     T = -25 °C: 9.217532872 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.31110147 V-1     T = -25 °C: 16.39072855 V-1
Break-through voltage: T = +20 °C: 411.1749907 V     T = -25 °C: 374.9742289 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:57:52 CEST jreher Updated box and position via API.
14. Apr 2021 18:39:17 CEST oafedulidis Assigned to capsule by script
05. Feb 2021 11:00:23 CET jreher Updated box and position via API.
03. Feb 2021 18:25:51 CET jreher Updated box and position via API.
11. Aug 2020 17:59:12 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:14 CEST jreher Updated APD location via API.
28. Jan 2020 14:36:55 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:40 CET jreher Updated APD location via API.
27. Nov 2019 19:45:24 CET jreher Updated APD location via API.
25. Nov 2019 17:18:23 CET jreher Updated box and position via API.
20. Aug 2019 12:35:04 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:39 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:48 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:10 CEST Tobias Imported from Hamamatsu datasheet.