RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2813031781 - Archived data from Wed, 03. February 2021 18:25:43 CET


This is all the information about APD 2813031781. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2813031781
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B10
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.9 V
Dark current: 8.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 92
Position in Box: 46
EP1 batch: 85
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.2075869 V     T = -25 °C: 346.6887714 V
Voltage for Gain 150: T = +20 °C: 390.024657 V     T = -25 °C: 354.1162207 V
Voltage for Gain 200: T = +20 °C: 394.3690898 V     T = -25 °C: 358.2896677 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.567962955 V-1     T = -25 °C: 4.658760956 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.018692453 V-1     T = -25 °C: 9.325051363 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.08408492 V-1     T = -25 °C: 14.73238631 V-1
Break-through voltage: T = +20 °C: 409.5445202 V     T = -25 °C: 373.4425868 V
   
Notes:


Version history

Time Author Change comment
11. Jul 2022 14:24:20 CEST oafedulidis Assigned to capsule by script
17. May 2021 09:14:54 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:00:15 CET jreher Updated box and position via API.
03. Feb 2021 18:25:43 CET jreher Updated box and position via API.
11. Aug 2020 18:04:55 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:09 CEST jreher Updated APD location via API.
17. Feb 2020 17:52:56 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:36 CET jreher Updated APD location via API.
27. Nov 2019 19:45:13 CET jreher Updated APD location via API.
25. Nov 2019 17:18:16 CET jreher Updated box and position via API.
20. Aug 2019 12:34:40 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:31 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:47 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:08 CEST Tobias Imported from Hamamatsu datasheet.