RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2813031780 - Archived data from Fri, 05. February 2021 11:00:15 CET


This is all the information about APD 2813031780. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2813031780
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C10
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 380 V
Dark current: 6.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 92
Position in Box: 45
EP1 batch: 85
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.288927 V     T = -25 °C: 344.9956256 V
Voltage for Gain 150: T = +20 °C: 388.1033996 V     T = -25 °C: 352.356402 V
Voltage for Gain 200: T = +20 °C: 392.4556025 V     T = -25 °C: 356.4816796 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.511654787 V-1     T = -25 °C: 4.917761981 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.877233326 V-1     T = -25 °C: 9.123239455 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.55442423 V-1     T = -25 °C: 16.32166743 V-1
Break-through voltage: T = +20 °C: 407.3016921 V     T = -25 °C: 371.3329203 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:21:57 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:28:28 CET jreher Updated box and position via API.
05. Feb 2021 11:00:15 CET jreher Updated box and position via API.
03. Feb 2021 18:25:43 CET jreher Updated box and position via API.
11. Aug 2020 18:04:54 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:09 CEST jreher Updated APD location via API.
17. Feb 2020 17:52:55 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:36 CET jreher Updated APD location via API.
27. Nov 2019 19:45:13 CET jreher Updated APD location via API.
25. Nov 2019 17:18:16 CET jreher Updated box and position via API.
20. Aug 2019 12:34:40 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:31 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:47 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:08 CEST Tobias Imported from Hamamatsu datasheet.