RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2812031745 - Archived data from Fri, 05. February 2021 11:00:13 CET


This is all the information about APD 2812031745. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2812031745
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B06
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 380.7 V
Dark current: 7.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 92
Position in Box: 31
EP1 batch: 84
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.9786169 V     T = -25 °C: 345.9590649 V
Voltage for Gain 150: T = +20 °C: 388.8700412 V     T = -25 °C: 353.4281796 V
Voltage for Gain 200: T = +20 °C: 393.2720168 V     T = -25 °C: 357.5434998 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.596370379 V-1     T = -25 °C: 4.963877601 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.077971724 V-1     T = -25 °C: 9.168450571 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.07095923 V-1     T = -25 °C: 16.39929996 V-1
Break-through voltage: T = +20 °C: 408.6183573 V     T = -25 °C: 372.6048673 V
   
Notes:


Version history

Time Author Change comment
27. Oct 2021 14:25:08 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 16:57:54 CEST jreher Updated box and position via API.
05. Feb 2021 11:00:13 CET jreher Updated box and position via API.
03. Feb 2021 18:25:41 CET jreher Updated box and position via API.
11. Aug 2020 18:04:52 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:08 CEST jreher Updated APD location via API.
17. Feb 2020 17:54:23 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:35 CET jreher Updated APD location via API.
27. Nov 2019 19:45:12 CET jreher Updated APD location via API.
25. Nov 2019 17:18:14 CET jreher Updated box and position via API.
20. Aug 2019 12:34:22 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:30 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:46 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:08 CEST Tobias Imported from Hamamatsu datasheet.