RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2812031736 - Archived data from Wed, 03. February 2021 18:25:40 CET


This is all the information about APD 2812031736. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2812031736
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A08
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 384.8 V
Dark current: 10.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 92
Position in Box: 23
EP1 batch: 84
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.3272024 V     T = -25 °C: 349.709893 V
Voltage for Gain 150: T = +20 °C: 393.2671582 V     T = -25 °C: 357.1881383 V
Voltage for Gain 200: T = +20 °C: 397.683904 V     T = -25 °C: 361.3895275 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.460481966 V-1     T = -25 °C: 4.981765305 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.573019523 V-1     T = -25 °C: 9.484576081 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.82960232 V-1     T = -25 °C: 14.30903729 V-1
Break-through voltage: T = +20 °C: 412.3158146 V     T = -25 °C: 376.0828895 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:00:12 CET jreher Updated box and position via API.
03. Feb 2021 18:25:40 CET jreher Updated box and position via API.
11. Aug 2020 18:04:50 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:07 CEST jreher Updated APD location via API.
17. Feb 2020 17:54:23 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:34 CET jreher Updated APD location via API.
27. Nov 2019 19:45:11 CET jreher Updated APD location via API.
25. Nov 2019 17:18:14 CET jreher Updated box and position via API.
20. Aug 2019 12:34:21 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:29 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:46 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:08 CEST Tobias Imported from Hamamatsu datasheet.