RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2812031735 - Archived data from Wed, 03. February 2021 18:25:40 CET


This is all the information about APD 2812031735. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2812031735
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A09
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 386.3 V
Dark current: 11.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 92
Position in Box: 22
EP1 batch: 84
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.6330966 V     T = -25 °C: 350.6483685 V
Voltage for Gain 150: T = +20 °C: 394.5422829 V     T = -25 °C: 358.1551273 V
Voltage for Gain 200: T = +20 °C: 398.9245306 V     T = -25 °C: 362.3810676 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.658853748 V-1     T = -25 °C: 4.9005415 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.175469174 V-1     T = -25 °C: 9.056293854 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.32644001 V-1     T = -25 °C: 15.9814693 V-1
Break-through voltage: T = +20 °C: 413.6446669 V     T = -25 °C: 377.3647847 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 10:40:06 CET oafedulidis Assigned to capsule by script
21. Apr 2021 11:02:32 CEST jreher Updated box and position via API.
05. Feb 2021 11:00:12 CET jreher Updated box and position via API.
03. Feb 2021 18:25:40 CET jreher Updated box and position via API.
11. Aug 2020 18:04:50 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:07 CEST jreher Updated APD location via API.
17. Feb 2020 17:54:23 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:34 CET jreher Updated APD location via API.
27. Nov 2019 19:45:11 CET jreher Updated APD location via API.
25. Nov 2019 17:18:14 CET jreher Updated box and position via API.
20. Aug 2019 12:34:21 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:29 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:46 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:08 CEST Tobias Imported from Hamamatsu datasheet.