RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2812031715 - Archived data from Wed, 03. February 2021 18:25:38 CET


This is all the information about APD 2812031715. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2812031715
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C12
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 384.1 V
Dark current: 7.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 92
Position in Box: 4
EP1 batch: 83
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.5087497 V     T = -25 °C: 348.8171897 V
Voltage for Gain 150: T = +20 °C: 392.3510301 V     T = -25 °C: 356.2473773 V
Voltage for Gain 200: T = +20 °C: 396.6902659 V     T = -25 °C: 360.3607712 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.426945396 V-1     T = -25 °C: 4.969445906 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.679702285 V-1     T = -25 °C: 9.27962486 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.26347887 V-1     T = -25 °C: 14.55560755 V-1
Break-through voltage: T = +20 °C: 410.9425857 V     T = -25 °C: 374.7924119 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:00:10 CET jreher Updated box and position via API.
03. Feb 2021 18:25:38 CET jreher Updated box and position via API.
11. Aug 2020 18:04:47 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:05 CEST jreher Updated APD location via API.
17. Feb 2020 17:54:21 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:33 CET jreher Updated APD location via API.
27. Nov 2019 19:45:10 CET jreher Updated APD location via API.
25. Nov 2019 17:18:12 CET jreher Updated box and position via API.
20. Aug 2019 12:33:54 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:27 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:45 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:07 CEST Tobias Imported from Hamamatsu datasheet.