Show Hamamatsu Avalanche Photo Diode 2812031701 - Archived data from Fri, 05. February 2021 11:00:06 CET


This is all the information about APD 2812031701. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2812031701
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B04
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.2 V
Dark current: 7.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 91
Position in Box: 25
EP1 batch: 83
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.3057609 V     T = -25 °C: 345.9370192 V
Voltage for Gain 150: T = +20 °C: 389.1958808 V     T = -25 °C: 353.3787639 V
Voltage for Gain 200: T = +20 °C: 393.5977963 V     T = -25 °C: 357.5660352 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.518225086 V-1     T = -25 °C: 4.908952232 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.78503682 V-1     T = -25 °C: 9.075347847 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.27291969 V-1     T = -25 °C: 16.07364805 V-1
Break-through voltage: T = +20 °C: 409.1987733 V     T = -25 °C: 373.0377118 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:27:30 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:00:06 CET jreher Updated box and position via API.
03. Feb 2021 18:25:35 CET jreher Updated box and position via API.
11. Aug 2020 18:04:44 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:04 CEST jreher Updated APD location via API.
17. Feb 2020 17:54:54 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:32 CET jreher Updated APD location via API.
27. Nov 2019 19:45:01 CET jreher Updated APD location via API.
25. Nov 2019 17:18:11 CET jreher Updated box and position via API.
20. Aug 2019 12:33:53 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:22 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:45 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:06 CEST Tobias Imported from Hamamatsu datasheet.