RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2811031640 - Archived data from Mon, 03. May 2021 10:27:28 CEST


This is all the information about APD 2811031640. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2811031640
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C04
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385.8 V
Dark current: 6.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 91
Position in Box: 5
EP1 batch: 82
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.780351 V     T = -25 °C: 349.8705652 V
Voltage for Gain 150: T = +20 °C: 393.5817726 V     T = -25 °C: 357.358166 V
Voltage for Gain 200: T = +20 °C: 397.8920067 V     T = -25 °C: 361.5513223 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.769811001 V-1     T = -25 °C: 4.935781178 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.329409555 V-1     T = -25 °C: 9.230177246 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.03111333 V-1     T = -25 °C: 15.9197085 V-1
Break-through voltage: T = +20 °C: 413.2642782 V     T = -25 °C: 377.0696544 V
   
Notes:


Version history

Time Author Change comment
15. Nov 2022 13:08:24 CET oafedulidis Assigned to capsule by script
30. Aug 2021 14:06:49 CEST oafedulidis Updated box and position via API.
03. May 2021 10:27:28 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:00:02 CET jreher Updated box and position via API.
03. Feb 2021 18:25:31 CET jreher Updated box and position via API.
11. Aug 2020 18:04:37 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:01 CEST jreher Updated APD location via API.
17. Feb 2020 17:55:23 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:29 CET jreher Updated APD location via API.
27. Nov 2019 19:44:59 CET jreher Updated APD location via API.
25. Nov 2019 17:18:08 CET jreher Updated box and position via API.
20. Aug 2019 12:32:45 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:20 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:43 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:05 CEST Tobias Imported from Hamamatsu datasheet.