RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2811031639 - Archived data from Mon, 03. May 2021 10:27:28 CEST


This is all the information about APD 2811031639. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2811031639
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B04
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 386.1 V
Dark current: 5.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 91
Position in Box: 4
EP1 batch: 82
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.1235857 V     T = -25 °C: 350.2648999 V
Voltage for Gain 150: T = +20 °C: 393.9640783 V     T = -25 °C: 357.7960596 V
Voltage for Gain 200: T = +20 °C: 398.3026813 V     T = -25 °C: 362.0215642 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.643238225 V-1     T = -25 °C: 4.772480673 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.962181046 V-1     T = -25 °C: 9.543744412 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.2777025 V-1     T = -25 °C: 14.88504739 V-1
Break-through voltage: T = +20 °C: 413.9479378 V     T = -25 °C: 377.8778394 V
   
Notes:


Version history

Time Author Change comment
19. May 2022 15:27:36 CEST oafedulidis Assigned to capsule by script
10. May 2021 14:00:44 CEST oafedulidis Updated box and position via API.
03. May 2021 10:27:28 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:00:02 CET jreher Updated box and position via API.
03. Feb 2021 18:25:30 CET jreher Updated box and position via API.
11. Aug 2020 18:04:37 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:00 CEST jreher Updated APD location via API.
17. Feb 2020 17:55:23 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:29 CET jreher Updated APD location via API.
27. Nov 2019 19:44:59 CET jreher Updated APD location via API.
25. Nov 2019 17:18:08 CET jreher Updated box and position via API.
20. Aug 2019 12:32:45 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:20 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:43 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:05 CEST Tobias Imported from Hamamatsu datasheet.