RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2810031569 - Archived data from Wed, 03. February 2021 18:25:23 CET


This is all the information about APD 2810031569. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2810031569
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B08
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 382.4 V
Dark current: 9.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 90
Position in Box: 5
EP1 batch: 80
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.8002079 V     T = -25 °C: 347.9816365 V
Voltage for Gain 150: T = +20 °C: 390.7079757 V     T = -25 °C: 355.2890223 V
Voltage for Gain 200: T = +20 °C: 395.0938959 V     T = -25 °C: 359.4549897 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.640664964 V-1     T = -25 °C: 5.170003838 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.213604099 V-1     T = -25 °C: 9.369941238 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.36044865 V-1     T = -25 °C: 16.46406318 V-1
Break-through voltage: T = +20 °C: 409.7461241 V     T = -25 °C: 373.6128194 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:59:54 CET jreher Updated box and position via API.
03. Feb 2021 18:25:23 CET jreher Updated box and position via API.
11. Aug 2020 18:04:27 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:54:56 CEST jreher Updated APD location via API.
17. Feb 2020 17:57:00 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:25 CET jreher Updated APD location via API.
27. Nov 2019 19:44:47 CET jreher Updated APD location via API.
25. Nov 2019 17:18:03 CET jreher Updated box and position via API.
20. Aug 2019 12:17:16 CEST jreher Updated APD batch assignment via API.
05. Jul 2019 13:48:12 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:42 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:02 CEST Tobias Imported from Hamamatsu datasheet.