RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2810031555 - Archived data from Wed, 03. February 2021 18:25:19 CET


This is all the information about APD 2810031555. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2810031555
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2412026915/2810031555
Unit: #1223 (barcode 1309011827)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: E12
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 383.1 V
Dark current: 8.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 89
Position in Box: 43
EP1 batch: 79
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.7794154 V     T = -25 °C: 347.1919759 V
Voltage for Gain 150: T = +20 °C: 390.6275273 V     T = -25 °C: 354.6000811 V
Voltage for Gain 200: T = +20 °C: 394.9734871 V     T = -25 °C: 358.7422555 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.663756134 V-1     T = -25 °C: 4.81477743 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.283965485 V-1     T = -25 °C: 9.819787721 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.53969904 V-1     T = -25 °C: 15.62498435 V-1
Break-through voltage: T = +20 °C: 410.2268286 V     T = -25 °C: 373.7785861 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:59:51 CET jreher Updated box and position via API.
03. Feb 2021 18:25:19 CET jreher Updated box and position via API.
11. Aug 2020 17:39:40 CEST jreher Updated APD characteristics via API.
03. Apr 2020 10:08:42 CEST jreher Assigned to capsule by script
13. Feb 2020 14:24:05 CET jreher Updated box and position via API.
27. Nov 2019 19:44:39 CET jreher Updated APD location via API.
25. Nov 2019 17:18:01 CET jreher Updated box and position via API.
13. Sep 2019 10:31:34 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 13:58:55 CEST markus.moritz
25. Jul 2019 12:10:41 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:48:07 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:41 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:01 CEST Tobias Imported from Hamamatsu datasheet.