RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2809031468 - Archived data from Tue, 08. December 2020 17:09:33 CET


This is all the information about APD 2809031468. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2809031468
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2809031468/2707030497
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: E03
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 384 V
Dark current: 7.7 nA
   
Screening Logistics:  
Available: No
Storage Box: 88
Position in Box: 32
EP1 batch: 77
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.0733764 V     T = -25 °C: 348.3969005 V
Voltage for Gain 150: T = +20 °C: 391.9040634 V     T = -25 °C: 355.8298338 V
Voltage for Gain 200: T = +20 °C: 396.2533048 V     T = -25 °C: 359.9783141 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.595230026 V-1     T = -25 °C: 4.766352101 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.140743863 V-1     T = -25 °C: 9.651223666 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.2166109 V-1     T = -25 °C: 15.311948 V-1
Break-through voltage: T = +20 °C: 411.535117 V     T = -25 °C: 375.2304108 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:59:41 CET jreher Updated box and position via API.
03. Feb 2021 18:25:10 CET jreher Updated box and position via API.
08. Dec 2020 17:09:33 CET jreher Assigned to capsule by script
06. Oct 2020 16:51:40 CEST jreher Updated box and position via API.
11. Aug 2020 17:39:29 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:44:27 CET jreher Updated APD location via API.
25. Nov 2019 17:17:56 CET jreher Updated box and position via API.
13. Sep 2019 10:30:41 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 12:51:53 CEST markus.moritz
25. Jul 2019 12:11:11 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:58 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:39 CET Tobias Corrected dark current unit.
20. Jun 2018 13:35:58 CEST Tobias Imported from Hamamatsu datasheet.